News

Follow Us

LinkedInInstagramX
NEWS
NewsLast updated 25 Nov 2026, 11:31 AM IST2 min read

(LT) L&T Wins a Major Battery Storage Order at Khavda

Reviewed by Abhinav Singhvi, Founder & CEO Hexawealth

Larsen & Toubro has secured a significant new order to build a large-scale battery storage facility, a win that directly feeds its strategy in the high-growth renewables sector. The project will add to the company's record order book, which already provides multi-year revenue visibility but has recently come with margin pressures.

The NSE filing classifies the Khavda project as a significant order, valued between ₹1,000 to ₹2,500 crore. It involves two of L&T's verticals—the Renewables business and L&T Electronic Products & Systems—and will use liquid-cooling technology. Research by GreentechLead notes L&T has recently won other large battery energy storage system (BESS) contracts in West Asia, showing a strategic push in this arena.

This win comes as the company balances spectacular order intake against cost pressures. According to a Financial Express report, rating agencies see the sector's biggest challenge as converting orders into profits and cash flow, not just winning them. CLSA analysts, cited by Upstox, remain optimistic about a pickup in execution supported by L&T's record backlog.

Key Points

  • L&T won a significant order to build a 300 MW / 900 MWh battery storage system in Khavda, Gujarat.
  • The order is valued between ₹1,000 to ₹2,500 crore and will use liquid-cooling technology.
  • It adds to a record order book of over ₹8.5 lakh crore, which provides long-term revenue visibility.
  • The win occurs amid industry-wide pressure to convert large order inflows into sustainable profit margins.

Hexa Perspective

For L&T, this order is another piece of fuel for its multi-year growth engine, specifically within the strategic renewables vertical. The catch, as seen in recent quarters, is that building this future revenue often comes at a cost to near-term profitability, with operating margins under pressure from complex project execution.

The company's ability to navigate this trade-off will define the value of this and other wins. It must execute this technically advanced project efficiently to protect margins, proving it can manage the scale and complexity the market is rewarding. The deal's success hinges on L&T's engineering prowess turning this backlog addition into quality earnings, not just top-line growth.

Trending news


Want this applied to your portfolio?

Talk to a HexaWealth advisor, or sync your mutual fund data for insights tailored to your holdings.

Share or follow HexaWealth

(LT) L&T Wins a Major Battery Storage Order at Khavda

Frequently asked questions

What is the L&T Khavda battery storage project?
Larsen & Toubro has won an order to develop a 300 MW / 900 MWh Battery Energy Storage System (BESS) at Khavda in Gujarat. The project, classified as significant, will use liquid-cooling technology to support grid stability and renewable energy integration.
How much is the L&T battery storage order worth?
According to the NSE filing, the order value for L&T's Khavda battery storage project is between ₹1,000 to ₹2,500 crore. The company classifies this within its 'significant' order category.
Who is the client for the Khavda battery storage project?
The NSE filing by L&T does not name the client. However, separate reports by Powerline and ESS News indicate that NTPC Green Energy Limited is developing a major BESS project at the Khavda solar complex, for which it recently awarded a related contract to another firm.
What technology will L&T use for the Khavda BESS?
L&T's press release states the 300 MW / 900 MWh Battery Energy Storage System at Khavda will utilize liquid-cooling technology. This method is considered advantageous for large-scale, high-density storage projects for better thermal management.
How does this order affect L&T's business?
The order adds to L&T's record order book, which stood at over ₹8.5 lakh crore at the end of Q2 FY27. It represents a strategic win in the renewables and energy storage sector, though the company faces the ongoing challenge of converting such large orders into strong profit margins.
What are the risks with liquid-cooled battery storage systems?
Analysis by SolarQuarter notes that while liquid cooling offers performance benefits for large-scale BESS, it introduces complexity. Risks include potential coolant leaks, pump failures, and higher maintenance requirements compared to air-cooled systems, which must be managed through careful design and monitoring.
What is the market outlook for battery storage in India?
The market for grid-scale battery storage in India is growing significantly. A government plan cited by the Press Information Bureau envisions installing 51.5 GW of battery energy storage capacity by 2030, with Khavda in Gujarat identified as a major upcoming renewable energy generation centre.